Loading Procedure for the PV450?

Discuss issues and ideas you have to configuring displays with PowerVision
MikeEasterling
Posts: 13
Joined: Tue Jan 18, 2011 10:09 pm

Loading Procedure for the PV450?

Post by MikeEasterling » Thu Sep 22, 2011 9:46 pm

Where do we find the procedure for creating and loading the PV450?
jtabb
Enovation Controls Development
Enovation Controls Development
Posts: 37
Joined: Mon Apr 04, 2011 8:59 am

Re: Loading Procedure for the PV450?

Post by jtabb » Fri Sep 23, 2011 8:29 am

This post explains procedure for installing a configuration.

How to load new configs

Here is a link to a forum post with the 2.2 IOM.

PowerVision Studio 2.2 Release

Thanks,
jtabb
FW Murphy Development Team
MikeEasterling
Posts: 13
Joined: Tue Jan 18, 2011 10:09 pm

Re: Loading Procedure for the PV450?

Post by MikeEasterling » Fri Sep 23, 2011 11:53 am

Yes, I've gone through the 2.2 IOM, but it stops at page 100. Past releases like the 1.1 IOM's had it very detailed out as to how to create and load even allow for multiple configs to be uploaded.

With new Config Revision, and new hardware (PV450), I don't want to guess at what is the correct procedure and surely don't want to do something like plug it into the wrong port that might brick the unit.
Can you verify that the 2.2 IOM has the detail of the Create and Load information and let me know which page?

Based on your link from the previous post. I should be using the Port B for loading? Plug it in and then power up the unit. Question: If I have the power demo harness going to port B, then how do I use Port B to load the config?

What I think is necessary is to plug the flash drive deutsch connector into Port A; and then plug my power deutsch connector into plug B.

I don't want to brick the unit and am not finding the detailed instruction on the how to.
ksaenz
Enovation Controls Development
Enovation Controls Development
Posts: 263
Joined: Thu Aug 19, 2010 7:53 am

Re: Loading Procedure for the PV450?

Post by ksaenz » Fri Sep 23, 2011 4:07 pm

Hello MikeEasterling,

You are correct, in the PV450 the USB connector goes into port A and the power connector goes into port B.

Regards,

ksaenz
MikeEasterling
Posts: 13
Joined: Tue Jan 18, 2011 10:09 pm

Re: Loading Procedure for the PV450?

Post by MikeEasterling » Mon Sep 26, 2011 10:22 am

I've created the config onto the USB flash. I plugged it into Port A and the power into Port B. The unit powers up and does normal stuff giving me no option of loading the software.
Am i doing something wrong?
ksaenz
Enovation Controls Development
Enovation Controls Development
Posts: 263
Joined: Thu Aug 19, 2010 7:53 am

Re: Loading Procedure for the PV450?

Post by ksaenz » Mon Sep 26, 2011 12:37 pm

For the PV450 hold the lower right button during power up to go to the bootload screen.